Introduction
|
|
1
Footings, Rastra
|
|
2
Rastra, Trusses, Roof, Sub-Floor plumbing, Passive Radon System
|
|
3
Solar System: Sand bed, Solar Collectors, Tubing & Manifold
|
|
4
Solar System Pressure Test, Slab Cement Pour, Windows/Doors, Stucco Base Coat
|
|
5
Roof Window Shaft Framing, Ceiling Sheetrock, Attic Insulation, Solar/Electric Hot Water Heater,
Stucco Finish Coat, Solar System Overview, Solar Control (Electrical & PLC)
|
|
6
Solar Control System (PLC Panel, Electrical Wiring, Temperature Sensors, Display Panel)
|
|
7
2007 Solar Tour, Takagi installed.
|
|
8
Lumber arrives, Floorplate layout, Central-Vac System design,
Interior wall framing.
|
|
9.1
Interior framing:
South bedroom/bath walls, closets, loft headers.
|
|
9.2
Interior framing:
More loft headers, loft joists, bathroom ceiling joists.
A coyote visits!
|
|
9.3
More interior framing:
Loft support posts, foyer-area framing, loft floor.
|
|
10
Final grading, landscape edging & mulch.
|
|
11
North & south porch work.
|
|
12
Window buck trimming,
Framing interior loft walls,
Installing pocket door frames.
|
|
13
Ventilation system parts arrive.
Chimney flue installation begins.
Ventilation system duct work.
|
|
14
Sheetmetal duct work.
Platform for ventilation system.
Some sheetrocking and
Lots & lots of ductwork!
|
|
15
Duct work continues...
|
|
16a
Tulikivi Quarry & Factory (Finland)
|
|
16b
Tulikivi Videos
|
|
17
Day 1
Installation of the Finnish
Tulikivi Masonry Furnace
|
|
18
Day 1 (cont.)
Installation of
Tulikivi Masonry Furnace
|
|
19
Day 2
Installation of
Tulikivi Masonry Furnace
|
|
20
Day 2 (cont.)
Installation of
Tulikivi Masonry Furnace
|
|
21
More ventilation system work.
|
|
22
The Tulikivi's first curing fires!
|
|
23
Amazing wild turkeys.
|
|
24
Prepping lawn area for seeding.
|
|
25
Whitetails everywhere!
|
|
26
Screened porch work.
|
|
27
Screened porch (continued...)
|
|