0
Introduction


1
Footings, Rastra


2
Rastra, Trusses, Roof, Sub-Floor plumbing, Passive Radon System


3
Solar System: Sand bed, Solar Collectors, Tubing & Manifold


4
Solar System Pressure Test, Slab Cement Pour, Windows/Doors, Stucco Base Coat


5
Roof Window Shaft Framing, Ceiling Sheetrock, Attic Insulation, Solar/Electric Hot Water Heater, Stucco Finish Coat, Solar System Overview, Solar Control (Electrical & PLC)


6
Solar Control System (PLC Panel, Electrical Wiring, Temperature Sensors, Display Panel)


7
2007 Solar Tour, Takagi installed.


8
Lumber arrives, Floorplate layout, Central-Vac System design, Interior wall framing.


9.1
Interior framing:
South bedroom/bath walls, closets, loft headers.


9.2
Interior framing:
More loft headers, loft joists, bathroom ceiling joists.
A coyote visits!


9.3
More interior framing:
Loft support posts, foyer-area framing, loft floor.


10
Final grading, landscape
edging & mulch.


11
North & south porch work.


12
Window buck trimming,
Framing interior loft walls,
Installing pocket door frames.


13
Ventilation system parts arrive.
Chimney flue installation begins.
Ventilation system duct work.


14
Sheetmetal duct work.
Platform for ventilation system.
Some sheetrocking and
Lots & lots of ductwork!


15
Duct work continues...


16a
Tulikivi Quarry & Factory (Finland)


16b
Tulikivi Videos


17
Day 1
Installation of
the Finnish
Tulikivi Masonry Furnace


18
Day 1 (cont.)
Installation of
Tulikivi Masonry Furnace


19
Day 2
Installation of
Tulikivi Masonry Furnace


20
Day 2 (cont.)
Installation of
Tulikivi Masonry Furnace


21
More ventilation system work.


22
The Tulikivi's first curing fires!


23
Amazing wild turkeys.


24
Prepping lawn area for seeding.


25
Whitetails everywhere!


26
Screened porch work.


27
Screened porch
(continued...)


Volunteers, Donations,
Contractors and Vendors