Installing completed wall sections.
| Hall section of SW bedroom closet. |
 |
| The wood pile is over half gone! |
 |
| Two red-tailed hawks. |
 |
| Closet door section goes in SW bedroom. |
 |
| View of south side of hallway. |
 |
| Part of south airlock in. |
 |
N section of W wall of SW bedroom.
N section of S airlock. |
 |
| From great room looking east down hallway. |
 |
Otherside of S airlock section.
(Right of Bruce; can see window thru door opening.) |
 |
| Temporary (I hope!) use for a clamp. |
 |
| You can never have enough clamps!! |
 |
| 080224_13 |
 |
| 080224_14 |
 |
| 080224_15 |
 |
| 080224_16 |
 |
| 080224_17 |
 |
| 080224_18 |
 |
| 080224_19 |
 |
| 080224_20 |
 |
| 080224_21 |
 |
| 080224_22 |
 |
| 080224_23 |
 |
| 080224_24 |
 |
| 080224_25 |
 |
| 080224_26 |
 |
Installing north wall top-plates.
| SW utility room top plate. |
 |
| North hall wall top plate. |
 |
| Bath & laundry top plates. |
 |
| West laundry room top plate. |
 |
| Temporary board above NW hall top plate. |
 |
| Mstr Bdrm entrance top plate. |
 |
| Complicated wall between MBdrm & Shower/Laundry. |
 |
| From above: East laundry/half bath walls. |
 |
| From above: Top plate detail. |
 |
Installed south wall top-plates.
Built the north loft header.
Turkeys cross south of the house.
(There were more, but I was too slow!!) |
 |
Using clamps to square up south wall;
prepping to apply south wall top plate. |
 |
| Clamp-use close-up. |
 |
| Clamps "awaiting a job." (ha) |
 |
| South hall wall top-plate finished! |
 |
Corner detail with 2x8 "leveling joist" above.
This board is being used to help eye-ball the top-plates.
Hoping for a level left floor, eventually, as the
cement floor isn't perfectly level. |
 |
| Top plate of SW bedroom & south entry. |
 |
North edge of loft floor header. Joist hangers
will be applied to the south face to receive the joists. |
 |
Installing completed wall sections.
| Bruce smiles after I exclaim "So many clamps!!" |
 |
Three sets of clamps used to help
install the joist hangers on the header. |
 |
| Clamp-o-rama!! |
 |
| End joist hanger. |
 |
| Joist hangers ready to be installed. |
 |
| Header ready to be hoisted above wall! |
 |
| North loft header set in place! |
 |
| Be berry berry careful! |
 |
Section of loft above master closet
laid out but not yet noe-tailed in.
View from west, looking east. |
 |
| View from north looking south. |
 |
Other end of joists where they end atop
the hall closet just east of the future stairs. |
 |
The stairs will go up from left
to right (W>E) in this area. |
 |
| View of loft section above mstr bdrm. |
 |
| Bruce admires his work! |
 |