National Solar Tour


Installing completed wall sections.
Hall section of SW bedroom closet.
The wood pile is over half gone!
Two red-tailed hawks.
Closet door section goes in SW bedroom.
View of south side of hallway.
Part of south airlock in.
N section of W wall of SW bedroom.
N section of S airlock.
From great room looking east down hallway.
Otherside of S airlock section.
(Right of Bruce; can see window thru door opening.)
Temporary (I hope!) use for a clamp.
You can never have enough clamps!!
080224_13
080224_14
080224_15
080224_16
080224_17
080224_18
080224_19
080224_20
080224_21
080224_22
080224_23
080224_24
080224_25
080224_26

Installing north wall top-plates.
SW utility room top plate.
North hall wall top plate.
Bath & laundry top plates.
West laundry room top plate.
Temporary board above NW hall top plate.
Mstr Bdrm entrance top plate.
Complicated wall between MBdrm & Shower/Laundry.
From above: East laundry/half bath walls.
From above: Top plate detail.

Installed south wall top-plates.
Built the north loft header.
Turkeys cross south of the house.
(There were more, but I was too slow!!)
Using clamps to square up south wall;
prepping to apply south wall top plate.
Clamp-use close-up.
Clamps "awaiting a job." (ha)
South hall wall top-plate finished!
Corner detail with 2x8 "leveling joist" above.
This board is being used to help eye-ball the top-plates.
Hoping for a level left floor, eventually, as the
cement floor isn't perfectly level.
Top plate of SW bedroom & south entry.
North edge of loft floor header. Joist hangers
will be applied to the south face to receive the joists.

Installing completed wall sections.
Bruce smiles after I exclaim "So many clamps!!"
Three sets of clamps used to help
install the joist hangers on the header.
Clamp-o-rama!!
End joist hanger.
Joist hangers ready to be installed.
Header ready to be hoisted above wall!
North loft header set in place!
Be berry berry careful!
Section of loft above master closet
laid out but not yet noe-tailed in.
View from west, looking east.
View from north looking south.
Other end of joists where they end atop
the hall closet just east of the future stairs.
The stairs will go up from left
to right (W>E) in this area.
View of loft section above mstr bdrm.
Bruce admires his work!