National Solar Tour


More loft work.
Resident redtail hawks.
Hawk watches over grazing deer.
Using Dad's laser-level to set joists level.
Slight variation in cement floor (5/8") requires
shims and adjustments to make loft floor level.
Bruce takes a reading off the laser level.
The red beam didn't show up in photos!
Shims in place along header - north laundry room.
End of north header of bedroom (east end).
South view of north laundry room header.
Shim on header along south mstr bdrm closet.
Checking result. It's good!!
Nailing joists into header.
Does this technique meet OSHA regulations?
Close-up of nails.
Ready, aim, FIRE!
Other end (north) of joists that were just nailed.

Continuing loft joist work.
Area over bathrooms/laundry.
Joists over temp. sink area in utility room.
Detail near loft floor/utility room fire escape.
Thinking ahead! Put a section of pipe between joists.
Area cut out for 90-degree PVC vent pipe.
Loft fire escape hatch framed!
Pointing the nail gun toward himself? EEEK!
Last over-bathroom joist in place.
Above loft view!
Above loft view!
Snow.
Snow...
... and More SNOW!!
It's pretty...
...but getting pretty OLD!
North header of master bath.
North header of master bath.

Joists over master bathroom.
Attaching west-most joist to west wall.
Joists cut to length, ready to place in hangers.
Nailing joists thru south header (out of view).
Underside of Mstr Bath joists.
Looking west thru utility room wall.
Toe-nailing joists.
Oops I missed the [camera] shot!
South area awaits it's joists.
Center area of loft.
NW area of loft.
Master bath joists finished.
Bruce & Maggie celebrate!

Comment.
Nineteen deer graze the north field.
They're a bit jumpy!
South header over SE bedroom door opening.
South header set in place & joist locations marked.
South loft header over south airlock.
Bruce takes measurements for joist lengths.
Joists over hallway will be 2-ft on center,
and double-two-by-sixes; with grating above.
East-most hallway double-joist.
Building the next hallway joist.
Using the hand plane.
Setting the joist in place.
Another good example of an OSHA-infraction!
(NOTE: Look at his feet!)
Five joists in place! Working westward.
South edge of loft joists (over closet).
Hall; looking west.
Another OSHA problem!
Hallway; looking eastward.
South edge of loft floor.
South edge of loft floor.
Is it straight?

Coyote hunts south field; south joist work;
deer & bunny action; drill holes for loft posts.
080316_01.
080316_02
080316_03
080316_04
080316_05
080316_06
080316_07
080316_08
080316_09
080316_10
080316_11
Support for water header needed to be
moved slightly north to allow west wall
in utility room with panel board to line up
with east wall of the loft. A minor oops.
Bruce moves clamps...
Nailing another header over utility room door.
This header will support the east wall of the loft.
Post location by south airlock determined.
SW post at base of stairs located.
Post at south edge of top of loft stairs.
Grazing deer stares at us thru the window.
Jumpy deer in north field.
Bunny hangs out under propane tank.
More jumpy deer. Seventeen total.
Bunny stayed under tank all day...
...later on I figured out why. Speedy was
under the white building (where the bunny lived
all winter! Bad, bad, cat!
Anchor hole for SW post at base of stairs.
Anchor hole by south air lock.
Closeup. Aren't these exciting photos?!