More loft work.
| Resident redtail hawks. |
 |
| Hawk watches over grazing deer. |
 |
Using Dad's laser-level to set joists level.
Slight variation in cement floor (5/8") requires
shims and adjustments to make loft floor level. |
 |
Bruce takes a reading off the laser level.
The red beam didn't show up in photos! |
 |
| Shims in place along header - north laundry room. |
 |
| End of north header of bedroom (east end). |
 |
| South view of north laundry room header. |
 |
| Shim on header along south mstr bdrm closet. |
 |
| Checking result. It's good!! |
 |
| Nailing joists into header. |
 |
| Does this technique meet OSHA regulations? |
 |
| Close-up of nails. |
 |
| Ready, aim, FIRE! |
 |
| Other end (north) of joists that were just nailed. |
 |
Continuing loft joist work.
| Area over bathrooms/laundry. |
 |
| Joists over temp. sink area in utility room. |
 |
| Detail near loft floor/utility room fire escape. |
 |
| Thinking ahead! Put a section of pipe between joists. |
 |
| Area cut out for 90-degree PVC vent pipe. |
 |
| Loft fire escape hatch framed! |
 |
| Pointing the nail gun toward himself? EEEK! |
 |
| Last over-bathroom joist in place. |
 |
| Above loft view! |
 |
| Above loft view! |
 |
| Snow. |
 |
| Snow... |
 |
| ... and More SNOW!! |
 |
| It's pretty... |
 |
| ...but getting pretty OLD! |
 |
| North header of master bath. |
 |
| North header of master bath. |
 |
Joists over master bathroom.
| Attaching west-most joist to west wall. |
 |
| Joists cut to length, ready to place in hangers. |
 |
| Nailing joists thru south header (out of view). |
 |
| Underside of Mstr Bath joists. |
 |
| Looking west thru utility room wall. |
 |
| Toe-nailing joists. |
 |
| Oops I missed the [camera] shot! |
 |
| South area awaits it's joists. |
 |
| Center area of loft. |
 |
| NW area of loft. |
 |
| Master bath joists finished. |
 |
| Bruce & Maggie celebrate! |
 |
Comment.
| Nineteen deer graze the north field. |
 |
| They're a bit jumpy! |
 |
| South header over SE bedroom door opening. |
 |
| South header set in place & joist locations marked. |
 |
| South loft header over south airlock. |
 |
| Bruce takes measurements for joist lengths. |
 |
Joists over hallway will be 2-ft on center,
and double-two-by-sixes; with grating above. |
 |
| East-most hallway double-joist. |
 |
| Building the next hallway joist. |
 |
| Using the hand plane. |
 |
| Setting the joist in place. |
 |
Another good example of an OSHA-infraction!
(NOTE: Look at his feet!) |
 |
| Five joists in place! Working westward. |
 |
| South edge of loft joists (over closet). |
 |
| Hall; looking west. |
 |
| Another OSHA problem! |
 |
| Hallway; looking eastward. |
 |
| South edge of loft floor. |
 |
| South edge of loft floor. |
 |
| Is it straight? |
 |
Coyote hunts south field; south joist work;
deer & bunny action; drill holes for loft posts.
| 080316_01. |
 |
| 080316_02 |
 |
| 080316_03 |
 |
| 080316_04 |
 |
| 080316_05 |
 |
| 080316_06 |
 |
| 080316_07 |
 |
| 080316_08 |
 |
| 080316_09 |
 |
| 080316_10 |
 |
| 080316_11 |
 |
Support for water header needed to be
moved slightly north to allow west wall
in utility room with panel board to line up
with east wall of the loft. A minor oops. |
 |
| Bruce moves clamps... |
 |
Nailing another header over utility room door.
This header will support the east wall of the loft. |
 |
| Post location by south airlock determined. |
 |
| SW post at base of stairs located. |
 |
| Post at south edge of top of loft stairs. |
 |
| Grazing deer stares at us thru the window. |
 |
| Jumpy deer in north field. |
 |
| Bunny hangs out under propane tank. |
 |
| More jumpy deer. Seventeen total. |
 |
| Bunny stayed under tank all day... |
 |
...later on I figured out why. Speedy was
under the white building (where the bunny lived
all winter! Bad, bad, cat! |
 |
| Anchor hole for SW post at base of stairs. |
 |
| Anchor hole by south air lock. |
 |
| Closeup. Aren't these exciting photos?! |
 |