National Solar Tour


Loft post construction.
Assembling the post bases.
Base of columns are treated lumber.
Constructed similar to the pole-building posts.
Ready for their untreated pieces.
Post base near south airlock.
Post bases near future stairs.
That looks dangerous!
Move your hand away from the side!!! EEEE!
Nailing 3rd board to other two.
080320_08
080320_09
080320_11
080320_12
080320_13
080320_14

Foyer-area header work.
080405_01.
080405_02
080405_03

Foyer-area joists.
080406_01.
080406_02
080406_03
080406_04
080406_05
080406_06
080406_07

Working on the loft floor;
deer shed their winter coats.
Watch your head when you stand up!
Aligning the edge over a joist.
080503_05
080503_06
Thank goodness for knee pads!
080503_08
080503_09
Checking the fit of a loft floor board.
Placing screws in loft floor.
Don't fall off!
Deer appear scruffy; shedding their winter coats!
We watch the deer...
...while the deer watch us!
Four deer bedded down.


PREVIOUS


NEXT

Contact Us