National Solar Tour


Playing with sheet metal.
090115_01. First duct set in place.
090115_02. A tricky piece.
090115_03. Completed sections await installation.
090115_04. Section two set in place.
(The "jog" is necessary so intake vents can pass
on the north side of the duct.)

Stand built for dehumidifyer,
ERV, and air-exchanger units.
090118_01.
Bruce screws support brackets together.
090118_02
North end of top shelf.
090118_03
Two bottom shelves.
090118_04
The units all fit!
(Now to get the duct work to align!)

Forming ductwork & sheetrocking utility room.
090122_00.
090122_08
Norm Glock, a retired Mpls teacher
(and friend of Bob Rose) delivers
1/2 cord of oak firewood.
090122_04
Installing sheetrock behind ventilation
equipment in utility room.
090122_10-12
Utility-side east wall of
loft partially sheetrocked.
090122_13-16
Utility NW corner sheetrocked.

Duct work for the air handler.
090126_01.
Expanding joint ready for installation.
090126_02
The expanding section goes between the duct & the air handler.
090126_03
Preparing the other end of the air handler.
090126_04
North end of the air handler.
090126_05
The fun continues.
(Crazy Bruce still thinks this is fun!)

More duct work fitting & taping.
090127_01
Duct for south end of air handler.
090127_02
South end of air handler.
090127_03
North end of air handler.
(Viewed from front.)
090127_04
North end of air handler.
(Viewed from top.)
090127_05
North end of air handler.
(Inside duct toward air handler.)
090127_06
South end of air handler.
(Inside duct toward air handler.)
090127_07
South end of air handler.
090127_08
Bruce sets the curved duct in place...
090127_09
Bruce "using his head!"
090127_10
Ready to cut the round hole for the dehumidifier.
090127_11
Round hole cut, fitted & taped. (north end)
090127_12
Bruce preparing south end "round duct" joint.
090127_13
Close-up view.
090127_14
Ready to see if it fits (and lines up!)
090127_15
Sliding it into place south of the air handler.
090127_17
Lower duct section completed.
Upper section awaits installation.

More duct work.
090128_02
090128_03
090128_04
090128_05
090128_06
090128_07
090128_08
090128_09
090128_14
090128_15
Bruce makes a custom section that will go between the
8x20 duct at the east end of the loft & it's grille.

More duct work.
090129_02
Seams all taped up now!
090129_01
Monkey Bruce (I can't bear to look!)
090129_03
090129_04
Cutting a 8" x 30" hole in the sheetrock.
090129_05
This is where the 8" x 30" grille will go.
090129_06
The custom piece goes in next.
090129_07
It might fit!
090129_08
Bruce determines where it's too tight.
090129_09
Custom piece awaits installation.
090129_11
Removing more drywall on the north side.
090129_15
090129_16
090129_20
090129_21