National Solar Tour


More duct work.
090130_01
Preparing to hang a support for the square duct pair.
090130_02
West-most duct in place. Level sits atop.
090130_05
West-most duct in place. Level sits atop.

More duct work.
090131_01
Cold air return in loft taped.
090131_02
090131_03
South side.
090131_04
North side.
090131_05
Fully taped & ready for final duct installation.
090131_09
090131_10
090131_11
090131_12
Another piece of sheetrock goes in.
090131_13
Loft - east wall. Ducts will come through
the 2x4 framed area in the lower right corner.

More duct work.
090201_01
Another piece of drywall need to go
up before the next duct could be installed.
090201_02
Nifty curved duct offset.
090201_03
Other end of the parallel ducts.
090201_04
The curved duct heads south beneath the larger duct.
090201_05
Another piece waiting to be installed.
090201_06
I think the previous piece will attach here.
090201_07
Bruce works some more on the piece from photo 5.
090201_08
Looking inside the duct!
090201_10
090201_11
090201_12
090201_13
090201_17
A drywall snowman? Hmmmm...

Picked up central vac pipe from the VAC Guys (Burnsville, MN) and continued working on ducts.
090202_01.
090202_02
090202_03
090202_04
090202_31
090202_32

More duct supplies arrive, more duct work.
090203_01.
090203_02
Semi arrives with replacement order of duct
supplies after the first shipment was lost.
090203_03
Support brackets for ducts.
090203_04
090203_05
090203_06
090203_07
090203_08
090203_09
090203_10

Bruce continues installing duct work.
090205_09
Northeast loft.
090205_10
Northwest loft.
090205_11
Southeast loft.
090205_12
Working on the west side of the south loft.
090205_14
Fitting the final piece on the south side of the dehumidifier.
090205_15
Supply into SW bedroom.
090205_17
Supply into SE bedroom.
090205_19
090205_20
By the end of the day this side had it's flexible duct, too!


PREVIOUS


NEXT

Contact Us