National Solar Tour


Ductwork done since Feb 5th.
090223_01.
Upper south wall, utility room.
090223_02
West utility wall.
090223_03
West utility wall (further north).
090223_04
090223_05
SE corner of area over master bathroom.
090223_06
South end of ERV/dehumidifier.
090223_07
North end of ERV/dehumidifier.
090223_08
090223_09
090223_10
090223_11
Upper north wall, SE bedroom.
090223_12
South side of loft wall.
090223_13
NW corner of loft.
090223_14
SW corner of loft.

Ductwork done since Feb 5.
090223_16
Dehumidifier controller.
090223_17
Maggie looking "bummed" because
she can't climb the ladder!
090223_18
NW loft area.
090223_19
North loft wall, looking east.
090223_20
NE corner of loft - looking over bathroom.
090223_21
SW loft duct.
090223_22
South loft wall, looking east.
090223_23
South loft wall, SW bedroom.
090223_24
Area north of loft, over bathroom,
looking into the utility room (looking NE).
090223_25
Sections with motorized dampers
awaiting installation.