Screened porch work.
The Plan: North Side
The Plan: West End
The Plan: Column, Wall, Header details
090813_01.
090813_02
090815_04
090815_06
Anchor bolts placed thru stucco into cement core.
(Click image for close-up.)
090815_09
090815_10
090815_11
Maggie always finds a way to be in the way!
"But I just want to be with you!"
090815_14
090815_15
090816_16.
090816_17
090816_18

Progress on the screened porch.
090818_01.
Bruce beefed up each of the 4 main posts (which support
the roof). The posts are 3 treated 2x4's nailed together.
The wood was green when the posts were installed. We
already had to replace one post, as it was so no longer
straight. He got the others perfectly plumb, then drilled 4
horizontal holes thru each post & installed a bolt. For
additional support against warpage, he placed double 3/4-
inch plywood on the north side of each post and single on
the south side. All of this will be covered with cedar.
090818_02
090818_04
090818_05
This section may have to be replaced, as Bruce made a [rare] boo-boo and placed nails on the cedar-side of this header. The nails tend to react with the tannins in the cedar and make black spots, so he'll likely redo this one.
Click for closeup to see what we're talking about.
090818_07
This really changes the look of the north side!